Proposal Information
Project Status
- Opened to traffic fall 2008
Bid Results
- Bid Award Summary (Sept. 10, 2007)
Form 14 Proposal Price Forms
- Ames-Lunda (JV)
- C.S. McCrossan
- Walsh-American Bridge (JV)
- Flatiron-Manson (JV)
Design-build Team Proposals
- Ames-Lunda (JV)
- C.S. McCrossan
- Walsh-American Bridge (JV)
- Flatiron-Manson (JV)
Design-build Visualizations
- Ames-Lunda (JV)
- C.S. McCrossan
- Walsh-American Bridge (JV)
- Flatiron-Manson (JV)
Request for Proposals (8/23/07)
- Book 1 (Contract)
- Book 2 (Project Requirement)
- Book 3 (Applicable Standards)
- Instructions to Proposers
RFP Addenda
- Addendum #1 (8/27/07)
- Addendum #2 (8/30/07)
- Addendum #3 (9/5/07)
- Addendum #4 (9/7/07)
- Addendum #5 (9/10/07)
- Addendum #6 (9/11/07)
Request for Qualifications
- RFQ (8/4/07)
The SOQs were due Aug. 8, 2007 at 6:00 a.m.
About the 35W Bridge project
State Project Number: 2783-120
E.R. MN 07(300)
Project Web site: http://projects.dot.state.mn.us/35wbridge/
35W Bridge Collapse site: http://www.dot.state.mn.us/i35wbridge/
Project Cost
- $234 million
Background
- On Aug. 1, 2007, the I-35W bridge over the Mississippi River collapsed. Mn/DOT expedited an emergency design-build contract to replace the collapsed structure by the end of 2008.
- The project includes reconstruction of I-35W from Washington Ave. to 4th Street, approximately 3/4 of a mile in length. The river crossing includes a 10-lane freeway (five lanes in each direction) with accommodations for future Light Rail Transit.
- Project layout
Contact
Jon Chiglo
I-35W Design-build Project Manager
Kevin Gutknecht
Communications Contact