Hwy 15 Overlay

Hutchinson to Dassel

Project complete

Click map for larger PDF version.

Summary of work

  • In 2014, Hwy 15 from Hutchinson to Dassel received an 1.5" (bituminous) overlay. Due to the extent of the deteriorated concrete an overlay of 3" was warranted, but funds were not available.
  • MnDOT secured additional funds to overlay the additional 1.5" in 2015.
  • 13.5 miles in length
  • Smoother road surface

 

Cost

    • $1.5 million Connect with us through Twitter Connect with us through YouTube Connect with us through Facebook