Mn/DOT Home Mn/DOT Home "" District 8
About D8
Construction
News & Events

Key Contacts

Duluth
Bemidji
Brainerd
Detroit Lakes
Rochester
Mankato
Willmar
Metro



Mn/DOT Home
FAQ
Site Map
Search
Info@DOT


Spacer Gif File511mn.org Logo

News Release

November 13, 2002

HIGHWAY 212 BETWEEN BIRD ISLAND AND HECTOR OPEN TO TRAFFIC

WILLMAR, Minn. - The Minnesota Department of Transportation, District 8, announced today that Highway 212 between Hector and Bird Island is now open to traffic.

According to Kelly Brunkhorst, Mn/DOT project engineer, barricades were removed at 2:00 p.m. today (November 13). Weather permitting; Brunkhorst anticipates that the city of Olivia will be open before the Thanksgiving holiday.

Highway 212 had been closed since May to complete $14 million in improvements to two sections of Highway 212. The project consisted of adding a passing lane, concrete paving, bituminous shoulders and lighting between the east city limits of Bird Island to the west city limits of Hector. In the city of Olivia, the highway was reconstructed and designed with a center left turn lane, on-street parking and concrete paving. The city also replaced water and sewer facilities. A mill and bituminous overlay was also included in the city of Bird Island .

Mn/DOT and project contractors thank motorists and businesses for their patience during the project.

Travelers can access road condition information by dialing 511 (not available on (Verizon) or on the Internet by logging on to www.511mn.org. Drivers calling from out of state for road information in Minnesota can call toll free: 800-542-0220. Drivers in the Twin Cities metro area can get traffic updates from KBEM radio, 88.5 FM.

 


See Orange
We're in the WORK ZONE together





 


District 8 - Willmar/Marshall/Hutchinson
2505 Transportation Road
Willmar, MN 56201
Tel: 320/231-5195
Tel: 800/657-3792

Contact:
Sandy East
Public Affairs Coordinator
320/214-3773