Overview
- MnDOT is currently reviewing options to determine if the bridge should be rehabilitated or replaced
- Project fact sheet (PDF, 1 MB)
Location
- City of Winona
Schedule
- Current preliminary design schedule (PDF, 211 KB)
- Construction begins summer 2014
Cost
- $150 million to $175 million (total planning-level cost estimate)
- Cost range includes right-of-way, design and construction contract administration and reflects a number of unknowns and assumptions
Open Houses
Oct. 27, 2010 open house
Oct. 21, 2009 open house