Overview
- The Red Wing Bridge Project is currently underway.
- The Project includes the Highway 63 (Eisenhower) Bridge over the Mississippi River and the Highway 63 Bridge over Highway 61, as well as the highway connections to Highway 61, Highway 58, and approach roadways in Wisconsin.
- MnDOT is currently in the preliminary phase, which includes gathering data and reviewing options, to determine if the bridges should be rehabilitated or replaced.
- Work is currently underway to identify a preferred alternative concept.
Location
- City of Red Wing
Schedule
- Current preliminary design phase will be complete in 2014
- Final design will be completed between 2014 to 2017
- Multi-year construction project will begin in Summer 2018 (proposed).
Contact Us
Project Manager
Chad Hanson, PE
Minnesota Department of Transportation
2900 48th St. NW, MS 060
Rochester, MN 55901
507-286-7637
chad.hanson@state.mn.us
Community Relations/ Public Affairs Coordinator
Kristin Kammueller
Minnesota Department of Transportation
2900 48th St NW
Rochester, MN 55901
507-286-7684
kristin.kammueller@state.mn.us
MnDOT Web Coordinator
Beth Blomquist
beth.blomquist@state.mn.us