Minnesota Department of Transportation

511 Travel Info

Hwy 60 Mill and Overlay

Wabasha Wabasha County MN

Project Details

Hwy 75 flooded near Kent
Highway 60 in Wabasha.

The Minnesota Department of Transportation will work with the city to Winona on a mill and overlay of Highway 60 from Highway 61 to the bridge over the Mississippi River. Click here for description of a mill and overlay.

Traffic impacts

  • Single lane traffic with flaggers

Cost estimate

  • $400 thousand

Americans with Disabilities Act

Accessibility and state highway projects

All MnDOT projects--both new construction and rehabilitation projects-- must include an evaluation to ensure compliance with the Americans with Disabilities Act.

This project is a reconstruction of roadway and will include ADA accomodations.

Contacts

Do you have an unresolved issue about this project?


MnDOT has an ombudsman who can assist you with your concerns about a project. The ombudsman provides neutral, independent, and informal issue resolution when the problem cannot be resolved through MnDOT’s normal channels, in most cases, that would be the MnDOT staff listed as contacts for the project. The ombudsman will look into your concern and, if appropriate, generate options for resolution. Sometimes the ombudsman will help you better understand why things are the way they are and cannot be changed. The ombudsman ensures that MnDOT practices are fair and appropriate.
Contact the MnDOT ombudsman