Minnesota Department of Transportation

511 Travel Info

News Release

Sept. 12, 2016

Orange barrels on a highway

Northbound Interstate 35 lane closed near Dundas exit for concrete repair

ROCHESTER, Minn. – Northbound Interstate 35 motorists will encounter a lane closure through Friday, Sept. 16 as Minnesota Department of Transportation crews repair a concrete road panel 1 miles south of the exit to Dundas.

The left lane of northbound I-35 near milepost 65 was closed Monday morning, Sept. 12. It will be closed for the repair work, which is expected to be completed by Sept. 16, weather permitting. If work is completed sooner, it could open sooner.

MnDOT urges motorists to always be attentive, drive with caution, slow down in work zones and never enter a road blocked with barriers or cones. For real-time traffic and travel information in Minnesota, visit www.511mn.org, call 5-1-1 or log on to www.mndot.gov.

###