Contacts
- Kristine Hernandez
TZD Coordinator/ Public Affairs Team Leader
507-286-7601 - Kristin Kammueller
Community Relations Coordinator
507-286-7684
Location
Minnesota Department of
Transportation
Rochester District 6
2900 48th Street
Rochester, MN 55901
| News Release Search | ||
| Search Statewide News | ||
Lane closures on southbound Interstate 35 in Steele County begin June 13
ROCHESTER, Minn. – Motorists will encounter single lane traffic on the northbound lanes of Interstate 35 near Owatonna beginning Monday, June 13, through September, according to the Minnesota Department of Transportation.
The ramp connecting westbound Highway 14 to southbound I-35 will remain closed, motorists should continue to follow the posted detour.
Mn/DOT anticipates periods of stop-and-go traffic in each direction before the construction zone due to heavy traffic volumes, especially on Friday and Sunday evenings. Motorists are encouraged to find alternate routes and avoid the area during peak travel times, if possible.
During backups, motorists should use both lanes and take turns merging into the construction zone, where single-lane traffic begins. This method reduces rear-end crashes and helps keep traffic flowing as best as possible.
The closures are necessary as work continues on the three-year reconstruction of Highway 14 from Waseca to Owatonna which also includes construction of a new interchange at I-35 and Highway 14.
When the project is complete, motorists will experience a smoother ride surface and a safer highway.
Mathiowetz Construction Co., Sleepy Eye, Minn., is the prime contractor for the project. The entire project is expected to be completed by June 2012.
MnDOT urges motorists to always drive with caution, slow down in work zones and never enter a road blocked with barriers or cones.
For statewide travel information visit www.511mn.org, call 5-1-1 or log on to www.mndot.gov.


