South Moorhead

Project complete

Hwy 75/8th St. project information

Summary of work

  • Pave Hwy 75/8th St. between Belsly Blvd/35th Ave and 40th Ave.
  • Install a traffic signal at 37th Ave.
  • Upgrade the existing traffic signal at 40th Ave. to include a flashing yellow arrow
  • Construct a multi-use trail on the west side of Hwy 75/8th St. between 35th Ave. and 40th Ave.
  • Construct a sidewalk on the east side of Hwy 75/8th St. between 30th Ave. and 40th Ave.

Cost

  • $1.3 million