I-94/Hwy 29 Interchange Area Project

Alexandria interchange reconstruction and Hwy 29 four-lane expansion project

Project Features

The Minnesota Department of Transportation, along with Douglas County and the city of Alexandria, will rebuild the I-94/Hwy 29 interchange and expand Hwy 29 to four lanes south of I-94 in 2015-2016. Work is expected to begin in July of 2015 and continue through the 2016 construction season.
Alexandria I-94/Hwy 29 Project Map

2015 work

  • Four-lane expansion of Hwy 29 from 1/4-mile south of County Hwy 28 to I-94
  • County Hwy 28 realigned to cross Hwy 29 in line with County Road 87
  • Roundabout constructed at Hwy 29 and County Hwy 28/County Road 87

2016 work

  • Remove and replace current I-94/Hwy 29 bridges
  • Rebuild I-94 ramps
  • Access adjustments at 50th Avenue South

Layout

Click here for the latest design layout for the project (4 MB PDF)

Construction Phase 1 and Phase 2 - 2015 construction (1 MB PDF)

Construction Phase 3 and Phase 4 - 2016 construction (1 MB PDF)

Traffic impacts

There are no traffic impacts at this time.

  • Access to local businesses will be maintained throughout the project.
  • Hwy 29 will remain open throughout the project
  • I-94 ramps will close for approximately two weeks in 2016

 

About this project

Why this project is needed

  • Existing and future operation of interchange which is characterized by inadequate spacing between intersections
  • Future operation of Hwy 29 south of I-94 as area continues to grow
  • Traffic congestion along 50th Avenue

Background

This proposed project is the result and recommendation that was brought forward from the Alexandria Area 2030 Transportation Study (completed in March 2011). For additional information regarding this Study, click here.