Minnesota Department of Transportation

511 Travel Info

Hwy 6 Emily, Outing

Crow Wing and Cass counties

About this project

Project location map -
Roadwork on Hwy 6 near Emily and Outing in 2019. Click map for larger PDF version.

Resurface and improve Highway 6 from south of Emily near Perry Lake, to Lake Roosevelt bridge in Outing in 2019.

Summary of work

  • Resurface 14 miles of roadway (mill and overlay)
  • Pave gravel shoulders south of Emily
  • Add right turn lanes at Smokey Hollow Rd and Fletcher Rd
  • Replace sidewalk connecting the Roosevelt Lake Bridge and the public dock in Outing
  • Replace/repair culverts and guardrail

Future impacts

2019

  • Periodic lane closures, flaggers and use of pilot car in rural areas
  • Sidewalk closures in Outing