I-94 Improvements

Rogers to St. Michael

Orange barrels on a highway


I-94 construction at Crow River Bridges - 2014Documents

Useful links

This project uses an unbonded concrete overlay process to rehabilitate existing pavement. Unbonded concrete overlay is a process which a new layer of concrete is poured over an existing layer of pavement with an interlayer between them to break the bond between the two layers. The interlayer allows the layers to expand and contract independently of each other. By allowing the layers to move freely the new concrete surface is less prone to cracking and pavement deterioration.