Project complete
Summary of work
- Reconstruct from 2nd St. SW to east of 3rd Ave. NE in Crosby, includes new road surface, side street connections, curb/gutter and sidewalk
- Resurface from 2nd St. SW in Crosby to west of 6th Ave. SW in Ironton, includes other repairs as needed
- Improve pedestrian accessibility, includes sidewalk and approach ramps
- Replace overhead street lights
- Repair or replace drainage