Minnesota Department of Transportation

511 Travel Info

Hwy 55—Buffalo to Rockford

Wright County

Project complete

MnDOT thanks you for your continued patience during this improvement project. We hope you enjoy the new roadway!

Project location map - Hwy 55
Hwy 55 roadwork from Buffalo to Rockford.

Summary of work

Buffalo to Rockford

  • Reconstruct Hwy 55 (full-depth reclamation) from Division St in Buffalo to Autumn Oaks/Electric Dr in Rockford, includes shoulders and turn lanes
  • Replace or repair underground culverts and cattle passes
  • Replace guardrail

Rockford

  • Resurface Hwy 55 in Rockford from Autumn Oaks/Electric Dr to east of Main St at the Crow River, includes shoulders and turn lanes
  • Install a center left-turn lane at Hwy 55/Walnut Pl
  • Upgrade pedestrian sidewalks and approach ramps from Ash St to Main St
  • Upgrade the signal at Hwy 55/Main St with a left-turn flashing yellow arrow