Minnesota Department of Transportation

511 Travel Info

Hwy 2/197 Access Management

Bemidji to Wilton, Beltrami County

study area map

Highway 2- Preferred Alternatives

Phase 1- 2019 Construction

Intersection at Moberg Drive / Adams Avenue

Preferred alternative Phase 1- Moberg Drive/Adams Avenue

Preferred alternative Phase 1- Moberg Drive/Adams Avenue

Phase 2- 2021 Construction

2A- County Road 9 to Brightstar Rd

Preferred alternative Phase 2A- County 9 to Brightstar Rd

Preferred alternative Phase 2A- County 9 to Brightstar Rd

2B- Brightstar Rd to Highway 89

Preferred alternative Phase 2B- Brightstar Rd to Highway 89

Preferred alternative Phase 2B- Brightstar Rd to Highway 89

2C- Wilton

Prefrred alternative Phase 2C- Wilton

Prefrred alternative Phase 2C- Wilton

Phase 3- 2022 Construction

Hwy 197 / 71

Highway 2/197 proposed alternative segment 3

Preferred alternative Phase 3- Hwy 197 / 71

 

Materials developed through planning process

Crash History

Crash history and location data

Crash data for the corridor


Access Management Brochure

Brochure (PDF)