5th Public Meeting (Oct. 4, 2017)
This public meeting will be held to explain the results of the recommended plan and what to expect during construction.
- Welcome
- Introduction
- Study
- Background
- Investigations
- Issues
- Recommended Plan
- What to Expect During Construction
- Traffic Staging
- Thank you
4th Public Meeting (Feb 21, 2017)
View the results of the Environmental Assessment/Environmental Assessment Worksheet
3rd Public Meeting Poster Boards (May 25, 2016)
This meeting is held to publish the results of the evaluation of alternatives and gather input on the preferred plan. A 5 span Steel I-Girder bridge constructed upstream (east) of the current bridge.
- Welcome
- Introduction
- Coordination
- Study
- Background
- Need
- Existing Conditions
- Evaluation
- Investigations
- Bridge Alternatives
- Roadway Alignments
- Preferred Plan
- Mitigation & Protection
- Thank you
2nd Public Meeting Poster Boards (Oct. 28, 2015)
The goal for this meeting was to display the evaluation criteria and outline the process, along with gathering input on the preliminary alignment and structural alternatives.
- Welcome
- Introduction
- Coordination
- Study
- Background
- Existing Conditions
- Evaluation
- Investigations
- Thank you
- Bridge Alternatives
- Roadway Alignments
1st Public Meeting Poster Boards (June 24, 2015)
This meeting is to introduce the overall project/need, and seek input on the existing conditions.