Minnesota Department of Transportation

511 Travel Info

Baudette / Rainy River International Bridge Replacement

Highway 72 / Highway 11

Baudette Bridge

Resources

Photos

Bridge Visualizations

Visit the Photo page for more visualizations

Baudette Bridge visualization 3Baudette Bridge visualization 4

Bridge Photos

Visit the Photo page for more International Bridge photos

Baudette Bridge visualization 3Baudette Bridge visualization 4

 

Public Meetings

5th Public Meeting (Oct. 4, 2017)

This public meeting will be held to explain the results of the recommended plan and what to expect during construction.

4th Public Meeting (Feb 21, 2017)

View the results of the Environmental Assessment/Environmental Assessment Worksheet

3rd Public Meeting Poster Boards (May 25, 2016)

This meeting is held to publish the results of the evaluation of alternatives and gather input on the preferred plan. A 5 span Steel I-Girder bridge constructed upstream (east) of the current bridge.

2nd Public Meeting Poster Boards (Oct. 28, 2015)

The goal for this meeting was to display the evaluation criteria and outline the process, along with gathering input on the preliminary alignment and structural alternatives.

1st Public Meeting Poster Boards (June 24, 2015)

This meeting is to introduce the overall project/need, and seek input on the existing conditions.