Hwy 92

Bagley

Project information

Highway 92 project limits. From railroad tracks south of highway 2 to Bagley High School
Hwy 92 project limits - RR tracks south of Hwy 2 to Bagley High School

Resurface Hwy 92 between south of the railroad tracks to Bagley High School.

UPDATE: Majority of the work south of Third Street is substantially complete and the project will resume in 2019 to complete Stages 2 and 3. This includes completing the multi-use pedestrian trail, concrete sidewalk, curb and gutter, and concrete boulevard, as well as final paving and turf work.

Summary of work

  • Replace pavement and sidewalks
  • New trail on east side by Bagley Park
  • New trail and sidewalk on west side between high school and downtown
  • Ugraded pedestrian accessibility and crossings
  • Replace traffic signal at intersection of Hwy 2/92
  • Upgrade/replace city utilities
  • Map- Detailed look along the project limits

Project staging

COMPLETED: Stage 1A- Main Ave South

    Stage 1A detour
    Stage 1A detour
  • Begins May 14 (approximately 6-7 weeks)
    • Hwy 92 from the Hwy 2 intersection south to the softball fields
    • Great Northern Drive SE (behind the fire station)
  • Detour map- Stage 1A

COMPLETED: Stage 1B- Hwy 2/92 intersection

  • Begins after stage 1A is complete (lasts 2 weeks)
    • Intersection will be closed for 2 weeks
  • Detour map- Stage 1B

RESUMES IN 2019: Stage 2- Main Ave North

  • Done concurrently with Stage 3:
    • Between Hwy 2 and Fourth Street N
    • No two consecutive crossovers can be closed at the same time
  • Detour map- Stage 2

RESUMES IN 2019: Stage 3- Main Ave North

  • Done concurrently with Stage 2:
    • Between Fourth Street N and Seventh Street N
  • Detour map- Stage 3

COMPLETED: Stage 4- Hwy 92 near Bagley High School

    Stage 4 detour
    Stage 4 detour
  • Done concurrently with Stage 1A
    • From Seveth Street N to past Bagley High School
    • Detour will last up to 3 weeks
  • Detour map- Stage 4

Truck Detour

Hwy 2 Truck Detour

Highway 92 truck detour
Hwy 2 Truck Detour

 

Hwy 92 Truck Detour

Highway 92 truck detour
Hwy 92 Truck Detour

 

 

Traffic Impacts

Traffic impacts

  • See project staging information above for construction timeline
  • Work will cease during the weekend of Art in the Park (Saturday, July 14)