Environmental Impact Statement

Federal Highway Administration approves combined Final Environmental Impact Statement and Record of Decision

The Federal Highway Administration has approved a combined Final Environmental Impact Statement/Record of Decision for the Hwy 53 Virginia to Eveleth project in accordance with federal requirements. The federal Final EIS describes the transportation and environmental impacts of the preferred alternative: Alternative E-2 (with the Interchange Option and Straight Option) and includes some updates to the Final EIS that was published under state rules in June 2015. The ROD explains the reasons for the project decision and summarizes the mitigation measures that will be incorporated in the project. The ROD concludes the federal environmental review process for the project.

Final Environmental Impact Statement/Record of Decision

Record of Decision and FEIS Front Matter
Chapter 1_Purpose and Need
Chapter 2_Alternatives
Chapter 3_Transportation Analysis
Chapter 4_Community and Social Analysis
Chapter 5_Physical and Environmental Analysis
Chapter 6_Indirect Secondary Impacts
Chapter 7_Cumulative Impacts
Chapter 8_Consultation and Coordination
Chapter 9_ Cost Analysis
Chapter 10_Summary of Mitigation
Chapter 11_Response to Comments on the DEIS
Appendix A_Easement Documents
Appendix B_Layout and Profile
Appendix C_Agency Correspondence
Appendix D_Northern Long-Eared Bat Survey Report
Appendix E_Green Sheets
Appendix F_Subpart 1_Wetland Permit Application
Appendix F_Subpart 2_Wetland Permit Application
Appendix G_Supplemental Noise Documentation
Appendix H_Reformatted Draft EIS Impact Summary Table

Adequacy Determination

MnDOT has found the Final Environmental Impact Statement (Final EIS) for the US Highway 53 Virginia to Eveleth project to be adequate in accordance with state rules, concluding the state environmental review process. The Adequacy Determination document describes the project decisions, summarizes the project impacts, identifies the measures to minimize harm to the environment, and provides responses to comments that were made on the state Final EIS.

US Hwy 53 Adequacy Determination (PDF 19 MB)

Final Environmental Impact Statement

As the Responsible Governmental Unit (RGU), the Minnesota Department of Transportation (MnDOT) has prepared a Final EIS in accordance with state requirements for the US Highway 53 Virginia to Eveleth project. The Final EIS describes the transportation and environmental impacts of the preferred alternative: Alternative E-2 (with the Interchange Option and Straight Option).

The comment period on the state Final EIS concluded July 6, 2015. MnDOT will consider any comments received and make an Adequacy Determination.

For the federal environmental process, after the state Adequacy Determination and in accordance with the provisions of the Moving Ahead for Progress in the 21st Century Act (MAP-21), the Federal Highway Administration (FHWA) and MnDOT will be issuing a single document that combines the Final EIS and the Record of Decision (ROD). This publication under federal rules is anticipated to occur in the fall of 2015. The intent to combine these documents was described on the signature page of the Draft EIS. After reviewing the comments received on the Draft EIS, FHWA and MnDOT jointly affirmed the decision to prepare a combined Final EIS/ROD.

Documentation regarding Section 4(f) recreational resource impacts is also included in the Final EIS. FHWA’s final de minimis determination for the Iron Range Off-Highway Vehicle Recreation Area will be included in the ROD.

Questions about the Final EIS can be directed to:

Pat Huston, Project Manager
MnDOT District 1
1123 Mesaba Avenue
Duluth, MN 55811
Patrick.Huston@state.mn.us

State Final EIS

To request this document in an alternative format, please contact the Affirmative Action Office at 651-366-4723 or 1-800-657-3774 (Greater Minnesota); 711 or 1-800-627-3529 (Minnesota Relay). You may also send an email to ADArequest.dot@state.mn.us. Please request at least one week in advance.

Front Matter and Executive Summary (PDF 2 MB)
Chapter 1─Purpose and Need (PDF 0.5 MB)
Chapter 2─Alternatives (PDF 18 MB)
Chapter 3─Transportation Analysis (PDF 1 MB)
Chapter 4─Community and Social Analysis (PDF 12 MB)
Chapter 5─Physical and Environmental Analysis (PDF 12 MB)
Chapter 6─Indirect Secondary Impacts (PDF 0.5 MB)
Chapter 7─Cumulative Impacts (PDF 0.5 MB)
Chapter 8─Consultation and Coordination (PDF 0.5 MB)
Chapter 9─Cost Analysis (PDF 0.5 MB)
Chapter 10─Summary of Mitigation (PDF 0.5 MB)

Appendix A─Easement Documents (PDF 4 MB)
Appendix B─Layout and Profile (PDF 15 MB)
Appendix C─Agendy Correspondence (PDF 4.5 MB)
Appendix D─Northern Long-Eared Bat Survey Report (PDF 5.5 MB)
Appendix E─Green Sheets (PDF 0.5 MB)
Appendix F─Wetland Permit Application (PDF 11 MB)
Appendix G─Supplemental Noise Documentation (PDF 5 MB)
Appendix H─Reformatted Draft EIS Summary Table (PDF 0.5 MB)

Draft Environmental Impact Statement

Front Matter and Executive Summary (PDF 2 MB)
Chapter 1─Purpose and Need (PDF 1 MB)
Chapter 2─Alternatives (PDF 6 MB)
Chapter 3─Transportation Analysis (PDF 3 MB)
Chapter 4─Community and Social Analysis (PDF 11 MB)
Chapter 5─Physical and Environmental Analysis (PDF 18.5 MB)
Chapter 6─Indirect Secondary Impacts (PDF 0.5 MB)
Chapter 7─Cumulative Impacts (PDF 0.5 MB)
Chapter 8─Consultation and Coordination (PDF 0.5 MB)
Chapter 9─Cost Analysis (PDF 0.5 MB)
Chapter 10─Comparison of Alternatives (PDF 0.5 MB)

Appendix A─Easement Documents (PDF 1 MB)
Appendix B─References (PDF 0.5 MB)
Appendix C─Correspondence (PDF 8 MB)
Appendix D─Taconite Production Tax (PDF 0.5 MB
Appendix E─Economic and Business Supporting Documents (PDF 1.5 MB)
Appendix F─Mesabi Trail and OHVRA Information (PDF 9 MB)
Appendix G─Water Supply_Water Appropriation Supporting Documents (PDF 15.5 MB)
Appendix H─Noise Supporting Documents (PDF 1 MB)
Appendix I─Hazardous Materials and Contaminated Properties Supporting Documents (PDF 3 MB)
Appendix J─Water Resources Technical Report (PDF 5.5 MB)
Appendix K─Alternatives Development Report (PDF 12 MB)
Appendix L─List of Preparers (PDF 0.5 MB)