Minnesota Department of Transportation

511 Travel Info

Hwy 73 Resurfacing Project

St. Louis County

This project is completed

About this project

Summary of work

  • Resurface pavement. (Mill-off two-inches of the existing bituminous surface from the driving lanes, then repave)
  • Minor culvert replacements

Cost

    • $1,218,256 Connect with us through Twitter Connect with us through YouTube Connect with us through Facebook