Minnesota Department of Transportation

511 Travel Info

Hwy 2 Ramps Repair

In Duluth

This project is completed, however the ramps will remain closed until the Bong Bridge is reopened in November.

The following ramps are closed.

  • Hwy 2 EB on-ramp from SB I-35 over I-35 and the C.P. Railroad tracks
  • Hwy 2 EB on-ramp over the C.P. RR tracks

About this project

Summary of work

  • Repair three ramps
  • Lighting improvements


  • $1,334,581 Connect with us through Twitter Connect with us through YouTube Connect with us through Facebook