Minnesota Department of Transportation

511 Travel Info

Hwy 123 bridge rehabilitation

Just east of Sandstone

This project is completed

About this project

Summary of work

  • Remove damaged deck pavement and patch
  • Apply a new epoxy-chip-seal wear-course layer over the entire deck
  • Repave concrete approaches
  • Replace bridge joints
  • Clean and repaint bridges segments
  • Repaint decorative metal deck railings
  • Strengthen structural steel

Cost

    • $1,158,763 Connect with us through Twitter Connect with us through YouTube Connect with us through Facebook