Traffic impacts Photo coming. There are no current traffic impacts. When the project begins in June, there will be single-lane closures and a temporary traffic-control signal system.
About this project Summary of work Remove damaged deck pavement and patch Apply a new epoxy-chip-seal wear-course layer over the entire deck Repave concrete approaches Replace bridge joints Clean and repaint bridges segments Repaint decorative metal deck railings Strengthen structural steel Cost $1,982,000