Minnesota Department of Transportation

511 Travel Info

Hwy 61 Devil Track River Bridge replacement project

In Cook County

Project completed


About this project

Summary of work

  • Replace the bridge over the Devil Track River
  • Approach work
  • Resurfacing

Cost

    • $2,495,379 Connect with us through Twitter Connect with us through YouTube Connect with us through Facebook