Minnesota Department of Transportation

511 Travel Info

News Release

July 25, 2013

Orange barrels on a highway

MnDOT Hwy 210 New Bridge Media Day

 

WHO:              MnDOT Hwy 210 New Bridge Supervisor, Tom Lund
                        MnDOT Resident Engineer, Brian Larson
                        MnDOT District One Public Affairs Coordinator, Beth Petrowske
                        MnDOT District One Public Affairs Intern, Justin Capelle

WHAT:            Display construction progress and answer questions about the Hwy 210
                        New Bridge Project

WHEN:           Monday, July 29, at 1 p.m. to approximately 2:30 p.m.

WHERE:         Meet at the Minnesota Power check-in trailer at the junction of Jay Cooke Road and Munger Trail.
                        We will leave the check-in location at 1:15 p.m. and drive in a caravan to the construction site.

OTHER:                                 

  • Hard hats and safety vests are required.
  • It can be hot and dusty at the site, bringing water to drink is advised.
  • Walking is required to get to the construction area, wear boots or good walking shoes.
  • This event will be rescheduled if it rains or it is too muddy at the site.

For information about the project go to
                        http://www.dot.state.mn.us/d1/projects/hwy210hwy2flood/index.html

 

###

Pay Attention Slow Down in Workzones