Minnesota Department of Transportation

511 Travel Info

Congressional Transportation Status Report

Hwy 210 bridge replacement in Brainerd

""

About the project

The Hwy 210 Mississippi River bridge in Brainerd was constructed in 1932 and is functionally obsolete. The bridge deck was last replaced in 1984 and the current structure lacks shoulders. The deck geometry and traffic volumes create safety problems for motorists and pedestrians.

In 2009 the average daily traffic volume was 26,000 and is forecast to increase to 40,000 by 2031.

Project benefits

Increased safety for motorists and pedestrians.

Highway 210 Brainerd bridge construction project