Jump to main content.
Minnesota Department of Transportation Go to 511
MnDOT A to Z | General Contacts | Simple Search | Advanced Search
bridge
 

CADD Standards Library - Bridge Details Manual Part II

Bridge Home | Bridge Training | Statewide Bridge Inspections | I-35W Bridge Collapse | Hydraulics | State Aid-Bridge | Contact Us

Files

 

 

 

Please contact the Bridge Office to verify that you are using the most current information.

 

 



Bridge Details Manual Part II

Download the entire Bridge Details Manual Part II, updated May 24th, 2012.

 

 

Concrete Barrier Type F, TL-4
PDF DGN Date Approved Date Revised
(With Separate End Post) (Without Concrete Wearing Course)

7.114e

 

7.114e

 

Dec 18, 2003 May 26, 2006
(With Integral End Post) (Without Concrete Wearing Course) 7.115e 7.115e Dec 18, 2003 May 26, 2006
(With Separate End Post) (With Concrete Wearing Course) 7.116e 7.116e Dec 18, 2003 May 26, 2006
(With Integral End Post) (With Concrete Wearing Course) 7.117e 7.117e Dec 18, 2003 May 26, 2006

 

Wire Fence (Design W-1) and Concrete Parapet (Type P-1)
PDF DGN Date Approved Date Revised
(With Integral End Post) 7.119e 7.119e Dec 18, 2003 N/A
(With Separate End Post) 7.120e 7.120e Dec 18, 2003 N/A

 

Concrete Barrier Type F, TL-5
PDF DGN Date Approved Date Revised
(With Integral End Post) (With Conc. Wearing Course) 7.122e 7.122e July 25, 2005 May 26, 2006
(With Integral End Post) (Without Conc. Wearing Course) 7.124e 7.124e July 25, 2005 May 26, 2006
(With Bridge Slab Sidewalk and Integral End Post) (With Conc. Wearing Course) 7.125e 7.125e July 25, 2005 May 26, 2006
(With Bridge Slab Sidewalk and Integral End Post) (Without Conc. Wearing Course) 7.126e

7.126e

 

July 25, 2005 May 26, 2006
(With Glare Screen and Integral End Post) (With Conc. Wearing Course) 7.128e

7.128e

 

Jun 14, 2006 Jun 14, 2006
(With Bikeway and Integral End Post) (With Conc. Wearing Course) 7.129e

7.129e

 

Jun 14, 2006 Jun 14, 2006

 

Solid Median Barrier Type F
PDF DGN Date Approved Date Revised
(With Wearing Course) 7.130e 7.130e Dec 18, 2003 N/A

 

Split Median Barrier Type F
PDF DGN Date Approved Date Revised
(With Wearing Course) 7.131e 7.131e Oct 29, 2004 N/A

 

Solid Median Barrier and Glare Screen Type F
PDF DGN Date Approved Date Revised
(With Concrete Wearing Course) 7.132e 7.132e Dec 18, 2003 N/A

 

Split Median Barrier and Glare Screen Type F
PDF DGN Date Approved Date Revised
(Without Concrete Wearing Course) 7.135e

7.135e

 

Apr 22, 2004 N/A
(With Concrete Wearing Course) 7.136e

7.136e

Apr 22, 2004 N/A

 

Offset Split Median Barrier and Glare Screen Type F
PDF DGN Date Approved Date Revised
(With Concrete Wearing Course) 7.137e 7.137e Apr 22, 2004 N/A

 

Metal Railing for Bikeways Type M-1 and Concrete Parapet Type P-1
PDF DGN Date Approved Date Revised
(With Integral End Post) 7.154e 7.154e Dec 18, 2003 N/A

 

Structural Tube Railing Design T-1 and Concrete Parapet (Type P-2, TL-4)
PDF DGN Date Approved Date Revised
(With Integral End Post)

7.157e

 

7.157e

 

Mar 30, 2010 N/A

 

Structural Tube Railing Design T-2 and Concrete Railing (Type F) or Concrete Parapet (Type P-1)
PDF DGN Date Approved Date Revised
(Conc. Railing Type F or Conc. Parapet Type P-1) 7.158e

7.158e

 

Oct 29, 2004 N/A

 

Concrete Barrier (Type P-4, TL-4) With Integral End Post
PDF DGN Date Approved Date Revised
(With Conc. Wearing Course) 7.173e

7.173e

 

Jul 25, 2005 Aug 10, 2006

 

5 Ft. Wire Fence (Design W-1) For Pedestrian Bridges
PDF DGN Date Approved Date Revised
(5 Ft. Wire Fence Design W-1 For Pedestrian Bridges) 7.202e

7.202e

 

Nov 26, 1985 Apr 23, 2003

 

Grouted Injected Fabric Formed Slope Paving
PDF DGN Date Approved Date Revised
(Grouted Injected Fabric Formed Slope Paving) 7.300e

7.300e

 

Dec 6, 1989 Oct 11, 2000

 

Concrete Slope Paving Under Bridges
PDF DGN Date Approved Date Revised
(Concrete Slope Paving Under Bridges) 7.301e

7.301e

 

Sep 26, 2003 N/A

 

Stabilized Aggregate Slope Paving Under Bridges
PDF DGN Date Approved Date Revised
(Stabilized Aggregate Slope Paving Under Bridges) 7.302e 7.302e Feb 7, 2005 N/A

(Riprap Slope with Geotex Filter)

(Slopes 1:2 and Flatter)

7.309e 7.309e May 24, 2011 May 24,2011

 

Conduit System For ---
PDF DGN Date Approved Date Revised
(Conduit System For --- ) 7.402e 7.402e
Sep 26, 2003
May 24, 2012

 

Conduit System Lighting
PDF DGN Date Approved Date Revised

(Type F Concrete Barrier Blister, With or Without Wearing Course)

7.406e

7.406e

 

May 24, 2011  

 

Prestressed Concrete Beams
PDF DGN Date Approved Date Revised
27" PCB (Pretensioned) 27M 7.504e 7.504e Oct 22, 2008 Oct 22, 2009
36" PCB (Pretensioned) 36M 7.505e 7.505e Oct 26, 2005 Oct 22, 2009
MN45" PCB (Pretensioned) MN45 7.507e 7.507e Oct 26, 2005 Oct 22, 2009
MN54" PCB (Pretensioned) MN54 7.508e 7.508e Oct 26, 2005 Oct 22, 2009
MN63" PCB (Pretensioned) MN63 7.509e 7.509e Jun 14, 2006 Oct 22, 2009

82MW Prestressed Concrete Beam

(Pretensioned) 82MW-

7.531e 7.531e Sep 22, 2011 May 24, 2012

96MW Prestressed Concrete Beam

(Pretensioned) 96MW-

7.532e 7.532e Sep 22, 2011 May 24, 2012
14", 18" and 22" Rectangular PCB (Pretensioned) RB

7.550e

 

7.550e

 

Oct 22, 2008 Oct 22, 2009

 

Waterproof Expansion Device
PDF DGN Date Approved Date Revised
(With Type F Barrier)

7.627e

 

7.627e

 

Sep 26, 2003 May 24, 2012
(Snow Plow Protection) (Use On Skews Over 15 Degrees and Less Than 50 Degrees) 7.628e

7.628e

 

Sep 26, 2003 May 24, 2011
(With Raised Median Or Sidewalk) 7.630e

7.630e

 

Sep 26, 2003 Feb 23, 2011

 

As-Built Bridge Data
PDF DGN Date Approved Date Revised
(As-Built Bridge Data)

7.900e

 

7.900e

 

Sep 26, 2003 Oct 28, 2008